NSSL 2D-Video-Disdrometer Events


1998 DATA - NSSL SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V98110_1.hyd April 20, 1998 6.73 mm yes tm98110_1.out
2. V98116_1.hyd April 26, 1998 30.54 mm yes tm98116_1.out
3. V98117_1.hyd April 27, 1998 35.23 mm yes tm98117_1.out
4. V98129_1.hyd May 9, 1998 9.94 mm yes tm98129_1.out
5. V98135_1.hyd May 15, 1998 3.05 mm yes tm98135_1.out
6. V98145_1.hyd May 25, 1998 4.33 mm yes tm98145_1.out
7. V98146_1.hyd May 26, 1998 13.59 mm yes tm98146_1.out
8. V98159_1.hyd June 8, 1998 13.82 mm (H) yes tm98159_1.out
9. V98162_1.hyd June 11, 1998 23.57 mm yes tm98162_1.out

1999 DATA - NSSL SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V99247_1.hyd September 4, 1999 0.30 mm no tm99247_1.out
2. V99248_1.hyd September 5, 1999 7.12 mm no tm99248_1.out
3. V99251_1.hyd September 8, 1999 17.96 mm no tm99251_1.out
4. V99254_1.hyd September 11, 1999 71.75 mm no tm99254_1.out
5. V99255_1.hyd September 12, 1999 0.29 mm no tm99255_1.out
6. V99258_1.hyd September 15, 1999 0.04 mm no tm99258_1.out
7. V99259_1.hyd September 16, 1999 0.23 mm no tm99259_1.out
8. V99260_1.hyd September 17, 1999 1.76 mm no tm99260_1.out
9. V99261_1.hyd September 18, 1999 0.81 mm no tm99261_1.out
10. V99262_1.hyd September 19, 1999 0.39 mm no tm99262_1.out
11. V99263_1.hyd September 20, 1999 3.10 mm no tm99263_1.out
12. V99267_1.hyd September 24, 1999 0.27 mm no tm99267_1.out
13. V99268_1.hyd September 25, 1999 9.00 mm no tm99268_1.out
14. V99270_1.hyd September 27, 1999 0.10 mm no tm99270_1.out
15. V99271_1.hyd September 28, 1999 0.14 mm no tm99271_1.out
16. V99281_1.hyd October 8, 1999 3.70 mm no tm99281_1.out
17. V99337_1.hyd December 3, 1999 10.27 mm no tm99337_1.out
18. V99338_1.hyd December 4, 1999 21.12 mm no tm99338_1.out
19. V99343_1.hyd December 9, 1999 37.82 mm no tm99343_1.out

2000 DATA - NSSL SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V00008_1.hyd January 8, 2000 4.22 mm no tm00008_1.out
2. V00048_1.hyd February 17, 2000 3.20 mm no tm00048_1.out
3. V00053_1.hyd February 22, 2000 0.93 mm no tm00053_1.out
4. V00054_1.hyd February 23, 2000 15.66 mm no tm00054_1.out
5. V00056_1.hyd February 25, 2000 7.55 mm no tm00056_1.out
6. V00062_1.hyd March 2, 2000 15.71 mm no tm00062_1.out
7. V00068_1.hyd March 8, 2000 2.59 mm yes tm00068_1.out
8. V00074_1.hyd March 14, 2000 9.22 mm no tm00074_1.out
9. V00077_1.hyd March 17, 2000 7.92 mm no tm00077_1.out
10. V00078_1.hyd March 18, 2000 2.09 mm no tm00708_1.out
11. V00081_1.hyd March 21, 2000 9.49 mm no tm00081_1.out
12. V00082_1.hyd March 22, 2000 10.60 mm no tm00082_1.out
13. V00083_1.hyd March 23, 2000 8.85 mm no tm00083_1.out
14. V00089_1.hyd March 29, 2000 12.60 mm no tm00089_1.out
15. V00092_1.hyd April 1, 2000 13.09 mm no tm00092_1.out
16. V00102_1.hyd April 11, 2000 1.25 mm no tm00102_1.out
17. V00107_1.hyd April 16, 2000 7.27 mm no tm00107_1.out
18. V00114_1.hyd April 23, 2000 4.34 mm no tm00114_1.out
19. V00116_1.hyd April 25, 2000 0.49 mm no tm00116_1.out
20. V00118_1.hyd April 27, 2000 10.19 mm no tm0118_1.out
21. V00120_1.hyd April 29, 2000 0.69 mm no tm00120_1.out
22. V00121_1.hyd April 30, 2000 26.44 mm no tm00121_1.out
23. V00122_1.hyd May 1, 2000 17.97 mm no tm00122_1.out
24. V00194_1.hyd July 12, 2000 0.91 mm no tm00194_1.out
25. V00203_1.hyd July 21, 2000 9.82 mm no tm00203_1.out
26. V00204_1.hyd July 22, 2000 19.49 mm no tm00204_1.out
27. V00209_1.hyd July 27, 2000 3.15 mm no tm00209_1.out
28. V00211_1.hyd July 29, 2000 4.09 mm no tm00211_1.out
29. V00268_1.hyd September 24, 2000 66.05 mm no tm00268_1.out
30. V00280_1.hyd October 6, 2000 4.87 mm no tm00290_1.out
31. V00281_1.hyd October 7, 2000 0.26 mm no tm00281_1.out
32. V00287_1.hyd October 13, 2000 0.61 mm no tm00287_1.out
33. V00288_1.hyd October 14, 2000 1.15 mm yes* tm00288_1.out
34. V00289_1.hyd October 15, 2000 77.24 mm yes* tm00289_1.out
35. V00290_1.hyd October 16, 2000 7.45 mm yes* tm00290_1.out
36. V00295_1.hyd October 21, 2000 16.81 mm yes tm00295_1.out
37. V00296_1.hyd October 22, 2000 22.65 mm yes tm00296_1.out
38. V00297_1.hyd October 23, 2000 34.11 mm yes* tm00297_1.out
39. V00297_2.hyd October 23, 2000 7.56 mm yes tm00297_2.out
40. V00298_1.hyd October 24, 2000 5.99 mm yes tm00298_1.out
41. V00299_1.hyd October 25, 2000 32.42 mm yes tm00299_1.out
42. V00300_1.hyd October 26, 2000 11.12 mm yes tm00300_1.out
43. V00301_1.hyd October 27, 2000 2.36 mm yes tm00301_1.out
44. V00303_1.hyd October 29, 2000 18.86 mm no tm00303_1.out
45. V00306_1.hyd November 1, 2000 13.87 mm yes tm00306_1.out
46. V00308_1.hyd November 3, 2000 23.67 mm yes* tm00308_1.out
47. V00309_1.hyd November 4, 2000 1.13 mm yes tm00309_1.out
48. V00310_1.hyd November 5, 2000 1.62 mm yes tm00310_1.out
49. V00311_1.hyd November 6, 2000 9.02 mm yes tm00311_1.out
50. V00312_1.hyd November 7, 2000 3.20 mm (R/S mix) yes tm00312_1.out
51. V00313_1.hyd November 8, 2000 43.27 mm (R/S mix) yes tm00313_1.out
52. V00314_1.hyd November 9, 2000 1.25 mm (S) yes tm00314_1.out
53. V00328_1.hyd November 23, 2000 2.45 mm yes tm00328_1.out
54. V00329_1.hyd November 24, 2000 17.64 mm yes tm00329_1.out

2001 DATA - NSSL SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V01010_1.hyd January 10, 2001 3.81 mm yes tm01010_1.out
2. V01011_1.hyd January 11, 2001 4.77 mm yes tm01011_1.out
3. V01016_1.hyd January 16, 2001 1.84 mm (R/S mix) yes tm01016_1.out
4. V01017_1.hyd January 17, 2001 13.44 mm (S) yes tm01017_1.out
5. V01026_1.hyd January 26, 2001 0.38 mm no tm01026_1.out
6. V01027_1.hyd January 27, 2001 6.69 mm yes tm01027_1.out
7. V01028_1.hyd January 28, 2001 17.81 mm yes tm01028_1.out
8. V01029_1.hyd January 29, 2001 13.66 mm yes tm01029_1.out
9. V01039_1.hyd February 8, 2001 1.09 mm yes tm01039_1.out
10. V01040_1.hyd February 9, 2001 6.46 mm (R/Z) yes tm01040_1.out
11. V01045_1.hyd February 14, 2001 13.12 mm yes tm01045_1.out
12. V01046_1.hyd February 15, 2001 11.03 mm (R/Z) yes tm01046_1.out
13. V01054_1.hyd February 23, 2001 24.14 mm yes* tm01054_1.out
14. V01055_1.hyd February 24, 2001 15.76 mm yes tm01055_1.out
15. V01058_1.hyd February 27, 2001 1.07 mm yes tm01058_1.out
16. V01059_1.hyd February 28, 2001 5.60 mm (R/Z) yes tm01059_1.out
17. V01060_1.hyd March 1, 2001 0.70 mm (R/Z) yes tm01060_1.out
18. V01067_1.hyd March 8, 2001 7.88 mm yes tm01067_1.out
19. V01070_1.hyd March 11, 2001 6.76 mm yes tm01070_1.out
20. V01071_1.hyd March 12, 2001 1.08 mm yes tm01071_1.out
21. V01085_1.hyd March 26, 2001 3.24 mm (S) yes tm01085_1.out
22. V01086_1.hyd March 27, 2001 1.24 mm yes tm01086_1.out
23. V01101_1.hyd April 11, 2001 23.80 mm yes tm01101_1.out
24. V01104_1.hyd April 14, 2001 3.77 mm no tm01104_1.out
25. V01123_1.hyd May 3, 2001 0.30 mm no tm01123_1.out
26. V01124_1.hyd May 4, 2001 1.11 mm yes tm01124_1.out
27. V01125_1.hyd May 5, 2001 18.00 mm yes tm01125_1.out
28. V01126_1.hyd May 6, 2001 27.04 mm  (H) yes tm01126_1.out
29. V01127_1.hyd May 7, 2001 0.36 mm no tm01127_1.out

2001 DATA - MESONET PIT SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V01138_1.hyd May 18, 2001 3.59 mm yes tm01138_1.out
2. V01139_1.hyd May 19, 2001 2.48 mm no tm01139_1.out
3. V01140_1.hyd May 20, 2001 10.37 mm no tm01140_1.out
4. V01141_1.hyd May 21, 2001 1.36 mm no tm01141_1.out
5. V01148_1.hyd May 28, 2001 14.08 mm yes* tm01148_1.out
6. V01149_1.hyd May 29, 2001 16.65 mm yes* tm01141_9.out
7. V01150_1.hyd May 30, 2001 2.20 mm yes* tm01150_1.out
8. V01165_1.hyd June 14, 2001 1.09 mm yes tm01165_1.out
9. V01172_1.hyd June 21, 2001 3.96 mm yes tm01172_1.out
10. V01179_1.hyd June 28, 2001 2.02 mm yes tm01179_1.out
11. V01180_1.hyd June 29, 2001 2.59 mm yes tm01180_1.out
12. V01181_1.hyd June 30, 2001 4.18 mm no tm01181_1.out
13. V01196_1.hyd July 15, 2001 0.33 mm no tm01196_1.out
14. V01210_1.hyd July 29, 2001 8.37 mm no tm01210_1.out
15. V01222_1.hyd August 10, 2001 27.20 mm no tm01222_1.out
16. V01235_1.hyd August 23, 2001 1.75 mm yes tm01235_1.out
17. V01238_1.hyd August 26, 2001 34.01 mm no tm01238_1.out
18. V01247_1.hyd September 4, 2001 0.38 mm no tm01247_1.out
19. V01248_1.hyd September 5, 2001 4.75 mm no tm01248_1.out
20. V01249_1.hyd September 6, 2001 10.87 mm yes tm01249_1.out
21. V01251_1.hyd September 8, 2001 15.78 mm (H) yes tm01251_1.out
22. V01252_1.hyd September 9, 2001 0.18 mm yes tm01252_1.out
23. V01258_1.hyd September 15, 2001 12.55 mm yes* tm01258_1.out
24. V01261_1.hyd September 18, 2001 61.83 mm yes tm01261_1.out
25. V01263_1.hyd September 20, 2001 15.30 mm yes tm01263_1.out
26. V01282_1.hyd October 9, 2001 9.29 mm yes* tm01282_1.out
27. V01283_1.hyd October 10, 2001 9.97 mm yes* tm01283_1.out
28. V01321_1.hyd November 17, 2001 2.06 mm no tm01321_1.out

2002 DATA - MESONET PIT SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V02018_1.hyd January 18, 2002 5.02 mm no tm02018_1.out
2. V02023_1.hyd January 23, 2002 10.73 mm yes tm02023_1.out
3. V02030_1.hyd January 30, 2002 27.45 mm yes* tm02030_1.out
4. V02031_1.hyd January 31, 2002 13.63 mm yes* tm02031_1.out
5. V02036_1.hyd February 5, 2002 4.24 mm (S) yes tm02036_1.out
6. V02037_1.hyd February 6, 2002 8.39 mm (S) yes tm02037_1.out
7. V02050_1.hyd February 19, 2002 3.83 mm yes tm02050_1.out
8. V02061_1.hyd March 2, 2002 9.11 mm (S) yes tm02061_1.out
9. V02077_1.hyd March 18, 2002 17.68 mm yes tm02077_1.out
10. V02078_1.hyd March 19, 2002 18.27 mm yes tm02078_1.out
11. V02079_1.hyd March 20, 2002 0.17 mm yes tm02079_1.out
12. V02089_1.hyd March 30, 2002 10.69 mm no tm02089_1.out
13. V02090_1.hyd March 31, 2002 0.71 mm no tm02090_1.out
14. V02096_1.hyd April 6, 2002 8.09 mm yes* tm02096_1.out
15. V02097_1.hyd April 7, 2002 40.98 mm yes* tm02097_1.out
16. V02098_1.hyd April 8, 2002 9.34 mm yes tm02098_1.out
17. V02102_1.hyd April 12, 2002 6.73 mm yes* tm02102_1.out
18. V02103_1.hyd April 13, 2002 27.51 mm yes tm02103_1.out
19. V02106_1.hyd April 16, 2002 1.57 mm yes tm02106_1.out
20. V02109_1.hyd April 19, 2002 2.50 mm no tm02109_1.out
21. V02110_1.hyd April 20, 2002 0.26 mm yes tm02110_1.out
22. V02111_1.hyd April 21, 2002 0.11 mm yes tm02111_1.out
23. V02115_1.hyd April 25, 2002 2.22 mm yes tm02115_1.out
24. V02116_1.hyd April 26, 2002 12.22 mm yes tm02116_1.out
25. V02117_1.hyd April 27, 2002 0.97 mm yes tm02117_1.out
26. V02125_1.hyd May 5, 2002 1.44 mm no tm02125_1.out
27. V02130_1.hyd May 10, 2002 1.66 mm no tm02130_1.out
28. V02137_1.hyd May 17, 2002 20.20 mm yes tm02137_1.out
29. V02145_1.hyd May 25, 2002 19.01 mm yes tm02145_1.out
30. V02147_1.hyd May 27, 2002 1.05 mm yes tm02147_1.out
31. V02148_1.hyd May 28, 2002 6.06 mm yes tm02148_1.out
32. V02155_1.hyd June 4, 2002 2.78 mm yes tm02155_1.out
33. V02156_1.hyd June 5, 2002 22.26 mm yes tm02156_1.out
34. V02159_1.hyd June 8, 2002 0.2 mm yes tm02159_1.out
35. V02160_1.hyd June 9, 2002 10.81 mm yes tm02160_1.out
36. V02164_1.hyd June 13, 2002 26.43 mm yes tm02164_1.out
37. V02167_1.hyd June 16, 2002 19.55 mm yes tm02167_1.out

2002 DATA - NSSL PIT SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V02353_1.hyd December 19, 2002 0.54 mm no tm02353_1.out
2. V02357_1.hyd December 23, 2002 30.33 mm (S) no tm02357_1.out
3. V02358_1.hyd December 24, 2002 0.39 mm no tm02358_1.out
4. V02364_1.hyd December 30, 2002 0.24 mm no tm02364_1.out

2003 DATA - NSSL PIT SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V03016_1.hyd January 16, 2003 1.27 mm (S) no tm03016_1.out
2. V03037_1.hyd February 6, 2003 27.68 mm (S) yes tm03037_1.out
3. V03040_1.hyd February 9, 2003 66.07 mm (S) no tm03040_1.out
4. V03044_1.hyd February 13, 2003 1.68 mm no tm03044_1.out
5. V03047_1.hyd February 16, 2003 0.12 mm no tm03047_1.out
6. V03050_1.hyd February 19, 2003 0.25 mm no tm03050_1.out
7. V03052_1.hyd February 21, 2003 8.00 mm yes tm03052_1.out
8. V03053_1.hyd February 22, 2003 4.14 mm yes tm03053_1.out
9. V03054_1.hyd February 23, 2003 1.28 mm (S) yes tm03054_1.out
10. V03055_1.hyd February 24, 2003 0.44 mm (S) no tm03055_1.out
11. V03072_1.hyd March 13, 2003 4.44 mm (H) no tm03072_1.out
12. V03076_1.hyd March 17, 2003 4.65 mm (H) yes tm03076_1.out
13. V03077_1.hyd March 18, 2003 15.60 mm (H) yes tm03077_1.out
14. V03078_1.hyd March 19, 2003 5.03 mm no tm03078_1.out
15. V03079_1.hyd March 20, 2003 0.36 mm no tm03079_1.out
16. V03084_1.hyd March 25, 2003 5.73 mm no tm03084_1.out
17. V03087_1.hyd March 28, 2003 4.38 mm yes tm03087_1.out
18. V03093_1.hyd April 3, 2003 0.90 mm no tm03093_1.out
19. V03096_1.hyd April 6, 2003 43.60 mm (H) yes tm03096_1.out
20. V03105_1.hyd April 15, 2003 0.44 mm yes tm03105_1.out
21. V03106_1.hyd April 16, 2003 17.32 mm yes tm03106_1.out
22. V03113_1.hyd April 23, 2003 7.16 mm yes* tm03113_1.out
23. V03118_1.hyd April 28, 2003 0.20 mm no tm03118_1.out
24. V03128_1.hyd May 8, 2003 2.68 mm no tm03128_1.out
25. V03130_1.hyd May 10, 2003 3.63 mm no tm03130_1.out
26. V03134_1.hyd May 14, 2003 6.05 mm (H) no tm03134_1.out
27. V03136_1.hyd May 16, 2003 3.50 mm yes tm03136_1.out
28. V03137_1.hyd May 17, 2003 0.21 mm yes tm03137_1.out
29. V03140_1.hyd May 20, 2003 19.52 mm no tm03140_1.out
30. V03141_1.hyd May 21, 2003 4.20 mm yes tm03141_1.out
31. V03143_1.hyd May 23, 2003 0.16 mm yes tm03143_1.out
32. V03144_1.hyd May 24, 2003 1.15 mm yes tm03144_1.out
33. V03153_1.hyd June 2, 2003 14.75 mm no tm03153_1.out
34. V03154_1.hyd June 3, 2003 10.03 mm no tm03154_1.out
35. V03155_1.hyd June 4, 2003 17.24 mm yes* tm03155_1.out
36. V03156_1.hyd June 5, 2003 4.90 mm yes tm03156_1.out
37. V03157_1.hyd June 6, 2003 15.39 mm yes tm03157_1.out
38. V03159_1.hyd June 8, 2003 7.86 mm no tm03159_1.out
39. V03162_1.hyd June 11, 2003 46.32 mm no tm03162_1.out
40. V03163_1.hyd June 12, 2003 13.93 mm no tm03163_1.out
41. V03177_1.hyd June 26, 2003 4.42 mm -- tm03177_1.out
42. V03242_1.hyd August 30, 2003 96.01 mm -- tm03242_1.out
43. V03243_1.hyd August 31, 2003 13.95 mm -- tm03243_1.out
44. V03244_1.hyd September 1, 2003 19.94 mm -- tm03244_1.out
45. V03254_1.hyd September 11, 2003 39.29 mm -- tm03254_1.out
46. V03272_1.hyd September 29, 2003 6.55 mm -- tm03272_1.out
47. V03273_1.hyd September 30, 2003 4.54 mm -- tm03273_1.out
48. V03277_1.hyd October 4, 2003 5.31 mm -- tm03277_1.out
49. V03282_1.hyd October 9, 2003 12.10 mm -- tm03282_1.out
50. V03287_1.hyd October 14, 2003 3.34 mm -- tm03287_1.out
51. V03311_1.hyd November 7, 2003 4.58 mm -- tm03311_1.out
52. V03317_1.hyd November 13, 2003 1.26 mm -- tm03317_1.out
53. V03318_1.hyd November 14, 2003 7.34 mm -- tm03318_1.out
54. V03321_1.hyd November 17, 2003 4.82 mm -- tm03321_1.out
55. V03342_1.hyd December 8, 2003 2.53 mm -- tm03342_1.out
56. V03345_1.hyd December 11, 2003 14.96 mm (S) -- tm03345_1.out
57. V03346_1.hyd December 12, 2003 11.86 mm (S) -- tm03346_1.out
58. V03360_1.hyd December 26, 2003 2.33 mm -- tm03360_1.out

2004 DATA - NSSL PIT SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V04025_1.hyd January 25, 2004 5.85 mm -- tm04025_1.out
2. V04032_1.hyd February 1, 2004 13.69 mm -- tm04032_1.out
3. V04033_1.hyd February 2, 2004 2.80 mm -- tm04033_1.out
4. V04035_1.hyd February 4, 2004 8.53 mm (S) -- tm04035_1.out
5. V04036_1.hyd February 5, 2004 1.38 mm (S) -- tm04036_1.out
6. V04060_1.hyd February 29, 2004 12.40 mm -- tm04060_1.out
7. V04064_1.hyd March 4, 2004 16.64 mm -- tm04064_1.out
8. V04073_1.hyd March 13, 2004 3.50 mm -- tm04073_1.out
9. V04074_1.hyd March 14, 2004 0.62 mm -- tm04074_1.out
10. V04088_1.hyd March 28, 2004 13.33 mm -- tm04088_1.out
11. V04098_1.hyd April 7, 2004 7.44 mm -- tm04098_1.out
12. V04100_1.hyd April 9, 2004 2.35 mm -- tm04100_1.out
13. V04101_1.hyd April 10, 2004 9.46 mm (H) -- tm04101_1.out
14. V04111_1.hyd April 20, 2004 2.31 mm -- tm04111_1.out
15. V04112_1.hyd April 21, 2004 1.29 mm -- tm04112_1.out
16. V04114_1.hyd April 23, 2004 2.38 mm -- tm04114_1.out
17. V04115_1.hyd April 24, 2004 1.30 mm -- tm04115_1.out
18. V04120_1.hyd April 29, 2004 1.18 mm -- tm04120_1.out
19. V04121_1.hyd April 30, 2004 21.24 mm -- tm04121_1.out
20. V04122_1.hyd May 1, 2004 1.30 mm -- tm04122_1.out
21. V04132_1.hyd May 11, 2004 0.27 mm -- tm04132_1.out
22. V04133_1.hyd May 12, 2004 1.13 mm -- tm04133_1.out
23. V04134_1.hyd May 13, 2004 7.69 mm -- tm04134_1.out
24. V04154_1.hyd June 2, 2004 12.50 mm (H) -- tm04154_1.out
25. V04155_1.hyd June 3, 2004 1.96 mm -- tm04155_1.out
26. V04156_1.hyd June 4, 2004 2.97 mm -- tm04156_1.out
27. V04157_1.hyd June 5, 2004 0.91 mm -- tm04157_1.out
28. V04159_1.hyd June 7, 2004 1.39 mm -- tm04159_1.out
29. V04160_1.hyd June 8, 2004 2.40 mm -- tm04160_1.out
30. V04161_1.hyd June 9, 2004 52.57 mm -- tm04161_1.out
31. V04162_1.hyd June10, 2004 7.33 mm -- tm04162_1.out
32. V04163_1.hyd June 11, 2004 0.36 mm -- tm04163_1.out
33. V04171_1.hyd June 19, 2004 15.99 mm -- tm04171_1.out
34. V04172_1.hyd June 20, 2004 13.54 mm -- tm04172_1.out
35. V04173_1.hyd June 21, 2004 26.51 mm -- tm04173_1.out
36. V04174_1.hyd June 22, 2004 21.93 mm -- tm04174_1.out
37. V04181_1.hyd June 29, 2004 6.93 mm -- tm04181_1.out
38. V04182_1.hyd June 30, 2004 17.56 mm -- tm04182_1.out
39. V04183_1.hyd July 1, 2004 21.34 mm -- tm04183_1.out
40. V04184_1.hyd July 2, 2004 0.66 mm -- tm04184_1.out
41. V04188_1.hyd July 6, 2004 6.38 mm -- tm04188_1.out
42. V04189_1.hyd July 7, 2004 7.38 mm -- tm04189_1.out
43. V04205_1.hyd July 23, 2004 9.82 mm -- tm04205_1.out
44. V04206_1.hyd July 24, 2004 15.50 mm -- tm04206_1.out
45. V04210_1.hyd July 28, 2004 51.43 mm -- tm04210_1.out
46. V04211_1.hyd July 29, 2004 2.89 mm -- tm04211_1.out
47. V04217_1.hyd August 4, 2004 8.73 mm -- tm04217_1.out
48. V04221_1.hyd August 8, 2004 6.52 mm -- tm04221_1.out
49. V04224_1.hyd August 11, 2004 28.39 mm -- tm04224_1.out
50. V04232_1.hyd August 19, 2004 2.63 mm -- tm04232_1.out
51. V04233_1.hyd August 20, 2004 4.52 mm -- tm04233_1.out
52. V04275_1.hyd October 1, 2004 11.04 mm -- tm04275_1.out
53. V04296_1.hyd October 22, 2004 1.85 mm -- tm04296_1.out
54. V04300_1.hyd October 26, 2004 2.11 mm -- tm04300_1.out
55. V04301_1.hyd October 27, 2004 1.10 mm -- tm04301_1.out
56. V04305_1.hyd October 31, 2004 1.52 mm -- tm04305_1.out

2005 DATA - NSSL PIT SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V05054_1.hyd February 23, 2005 14.56 mm -- tm05054_1.out
2. V05058_1.hyd February 27, 2005 8.88 mm -- tm05058_1.out
3. V05068_1.hyd March 9, 2005 0.36 mm -- tm05068_1.out
4. V05074_1.hyd March 15, 2005 1.78 mm -- tm05074_1.out
5. V05075_1.hyd March 16, 2005 0.96 mm -- tm05075_1.out
6. V05081_1.hyd March 22, 2005 0.13 mm -- tm05081_1.out
7. V05086_1.hyd March 27, 2005 0.28 mm -- tm05086_1.out
8. V05091_1.hyd April 1, 2005 3.79 mm -- tm05091_1.out
9. V05096_1.hyd April 6, 2005 1.85 mm -- tm05096_1.out
10. V05109_1.hyd April 19, 2005 0.10 mm -- tm05109_1.out
11. V05111_1.hyd April 21, 2005 0.27 mm -- tm05111_1.out
12. V05115_1.hyd April 25, 2005 1.53 mm -- tm05115_1.out
13. V05122_1.hyd May 2, 2005 18.53 mm -- tm05122_1.out
14. V05123_1.hyd May 3, 2005 0.63 mm -- tm05123_1.out
15. V05124_1.hyd May 4, 2005 0.52 mm -- tm05124_1.out
16. V05133_1.hyd May 13, 2005 15.31 mm -- tm05133_1.out
17. V05143_1.hyd May 23, 2005 3.58 mm -- tm05143_1.out
18. V05144_1.hyd May 24, 2005 3.25 mm -- tm05144_1.out
19. V05145_1.hyd May 25, 2005 0.79 mm -- tm05145_1.out
20. V05146_1.hyd May 26, 2005 1.51 mm -- tm05146_1.out
21. V05147_1.hyd May 27, 2005 6.06 mm -- tm05147_1.out
22. V05151_1.hyd May 31, 2005 0.27 mm -- tm05151_1.out
23. V05152_1.hyd June 1, 2005 9.79 mm -- tm05152_1.out
24. V05155_1.hyd June 4, 2005 0.75 mm -- tm05155_1.out
25. V05156_1.hyd June 5, 2005 8.25 mm -- tm05156_1.out
26. V05157_1.hyd June 6, 2005 0.03 mm -- tm05157_1.out
27. V05158_1.hyd June 7, 2005 0.16 mm -- tm05158_1.out
28. V05161_1.hyd June 10, 2005 21.98 mm -- tm05161_1.out
29. V05162_1.hyd June 11, 2005 1.15 mm -- tm05162_1.out
30. V05164_1.hyd June 13, 2005 23.27 mm -- tm05164_1.out
31. V05167_1.hyd June 16, 2005 3.08 mm -- tm05167_1.out
32. V05168_1.hyd June 17, 2005 9.13 mm -- tm05168_1.out
33. V05182_1.hyd July 1, 2005 7.56 mm -- tm05182_1.out
34. V05183_1.hyd July 2, 2005 0.18 mm -- tm05183_1.out
35. V05185_1.hyd July 4, 2005 26.32 mm -- tm05185_1.out
36. V05186_1.hyd July 5, 2005 3.20 mm -- tm05186_1.out
37. V05194_1.hyd July 13, 2005 1.36 mm -- tm05194_1.out
38. V05195_1.hyd July 14, 2005 11.57 mm -- tm05195_1.out
39. V05208_1.hyd July 27, 2005 6.00 mm -- tm05208_1.out
40. V05217_1.hyd August 5, 2005 1.42 mm -- tm05217_1.out
41. V05218_1.hyd August 6, 2005 0.35 mm -- tm05218_1.out
42. V05219_1.hyd August 7, 2005 0.48 mm -- tm05219_1.out
43. V05220_1.hyd August 8, 2005 2.95 mm -- tm05220_1.out
44. V05225_1.hyd August 13, 2005 7.76 mm -- tm05225_1.out
45. V05226_1.hyd August 14, 2005 11.90 mm -- tm05226_1.out
46. V05227_1.hyd August 15, 2005 10.29 mm -- tm05227_1.out
47. V05228_1.hyd August 16, 2005 4.06 mm -- tm05228_1.out
48. V05229_1.hyd August 17, 2005 0.34 mm -- tm05229_1.out
49. V05232_1.hyd August 20, 2005 42.24 mm -- tm05232_1.out
50. V05233_1.hyd August 21, 2005 13.30 mm -- tm05233_1.out
51. V05234_1.hyd August 22, 2005 0.84 mm -- tm05234_1.out
52. V05238_1.hyd August 26, 2005 1.09 mm -- tm05238_1.out
53. V05240_1.hyd August 28, 2005 12.63 mm -- tm05240_1.out
54. V05258_1.hyd September 15, 2005 17.72 mm -- tm05258_1.out
55. V05273_1.hyd September 30, 2005 20.86 mm -- tm05273_1.out
56. V05284_1.hyd October 11, 2005 4.93 mm -- tm05284_1.out
57. V05351_1.hyd December 17, 2005 2.36 mm -- tm05351_1.out
58. V05358_1.hyd December 24, 2005 0.41 mm -- tm05358_1.out

2006 DATA - NSSL PIT SITE
EVENT JULIAN DAY/FILE DATE RAIN CIM data 2DVD missing data
1. V06028_1.hyd January 28, 2006 6.56 mm (S) -- tm06028_1.out
2. V06034_1.hyd February 3, 2006 0.13 mm -- tm06034_1.out
3. V06049_1.hyd February 18, 2006 5.92 mm -- tm06049_1.out
4. V06061_1.hyd March 2, 2006 0.56 mm -- tm06061_1.out
5. V06062_1.hyd March 3, 2006 0.27 mm -- tm06062_1.out
6. V06068_1.hyd March 9, 2006 3.39 mm -- tm06068_1.out
7. V06076_1.hyd March 17, 2006 0.82 mm -- tm06076_1.out
8. V06077_1.hyd March 18, 2006 10.31 mm -- tm06077_1.out
9. V06078_1.hyd March 19, 2006 10.28 mm -- tm06078_1.out
10. V06088_1.hyd March 29, 2006 2.21 mm -- tm06088_1.out
11. V06089_1.hyd March 30, 2006 1.15 mm (H) -- tm06089_1.out
12. V06092_1.hyd April 2, 2006 0.65 mm -- tm06092_1.out
13. V06096_1.hyd April 6, 2006 0.86 mm -- tm06096_1.out
14. V06118_1.hyd April 28, 2006 23.93 mm -- tm06118_1.out
15. V06119_1.hyd April 29, 2006 46.76 mm -- tm06119_1.out

* Indicates that CIM data are available for only part of the event.
Red-data contains snow
Blue-data contains freezing rain
Green-data contains hail

Note: Due to the presence of large ice hydrometeors, precipitation amounts in red are likely overestimates.


2DVD PIT INSTALLATION/MODIFICATIONS

Disdrometer installed at mesonet pit site on 05/18/01
Pit covered with test splash guard material #1 on 5/26/01
Pit covered with test splash guard material #2 on 6/20/01
Splash guard replaced on 8/22/01
Disdrometer installed at NSSL pit site on 12/18/02
Splash guard replaced on 5/20/04